Doniphan Drive Phase III Project
Texas Department of Transportation
El Paso, Texas
|
Back to Project List
|
|
|
 |
|
|
Jet Grouting
|
|
Jet grouted columns provide continuous cutoff and excavation support wall to mitigate the movement of
contaminated soils and groundwater into the construction zone.
|
|
|
Project Overview: |
|
Layne GeoConstruction designed and installed over 2,000 jet grout columns to provide soil stabilization for
utility construction along 1,500 linear feet of utility trench in a low lying area with shallow groundwater.
The single-fluid jet grout columns acted as a seepage barrier/cut-off wall, mitigating the migration of
contaminated soil and groundwater from an adjacent commercial fueling station. The jet grout columns were
constructed in sand, silt and gravel soils.
|
|
|
Value of Work Performed: |
|
$775,000 |
|
Project Duration: |
|
5 months |
|
Project Completion Date: |
|
January 1999 |
|
Project Reference: |
General Contractor:
Dan Williams Company
Hector Martinez
(915) 781-1788
|
|
|
|
|
|