Doniphan Drive Phase III Project
Texas Department of Transportation
El Paso, Texas
Back to Project List
Jet Grouting
Jet grouted columns provide continuous cutoff and excavation support wall to mitigate the movement of contaminated soils and groundwater into the construction zone.
Project Overview:
Layne GeoConstruction designed and installed over 2,000 jet grout columns to provide soil stabilization for utility construction along 1,500 linear feet of utility trench in a low lying area with shallow groundwater.

The single-fluid jet grout columns acted as a seepage barrier/cut-off wall, mitigating the migration of contaminated soil and groundwater from an adjacent commercial fueling station. The jet grout columns were constructed in sand, silt and gravel soils.

    Value of Work Performed:
$775,000
Project Duration:
5 months
Project Completion Date:
January 1999
Project Reference:
General Contractor:
Dan Williams Company