Hart Street / WWPS / Pier 2
Force Main Replacement Project
Sand Island, Honolulu
Oahu, Hawaii
Back to Project List
Jet Grouting
Jet grout columns provided soil stabilization and support below deep piles supporting 500 ton crane loads, during tunneling of twin 1.2 meter diameter pipes.
Project Overview:
Work was undertaken within the main shipping terminal between Hawaii and the mainland. In one area, jet grouting was performed at a depth of over 38 meters along the alignment of two 1.2 meter sewer lines that were subsequently tunneled below the terminal pier foundation piles. Working from a pile-supported platform and over water along Honolulu Harbor, multiple, continuous rows of 2 meter diameter, interconnected columns were installed above and below the tunnel alignment to stabilize the soils and prevent foundation subsidence during the installation of the tunnels.

Jet grouting was also completed at micro-tunneling receiving and jacking pits to provide support to existing utilities and the surrounding ground, as well as for groundwater control during construction. Jet grouted columns at pits were installed to depths up to 16 meters within fill materials, and sands and silts.

    Value of Work Performed:
$1,400,000
Project Duration:
8 months
Project Completion Date:
December 2000
Project Reference:
Engineer Consultant:
URS / Woodward Clyde
(808) 737-5300