Argentine Naval Commission Building
Washington, District of Columbia
|
Back to Project List
|
|
|
 |
|
|
|
Project Overview: |
|
Designed and installed underpinning to stabilize a high profile, sensitive historic structure
utilizing jet grouted columns. The majority of the work was completed in low-headroom and within
small rooms and hallways while the existing embassy and bank remained operational. Jet grouted
underpinning columns were installed through a clay deposit to a depth of up to 52 feet, with a
typical structural capacity of 200 tons.
|
|
|
Value of Work Performed: |
|
$918,000 |
|
Project Duration: |
|
12 months |
|
Project Completion Date: |
|
April 1998 |
|
Project Reference: |
Project Owner
Rueben Bolognesi
Argentine Naval Commission
Washington, DC
(202) 626-2111
|
|
|
|
|
|