Jet Grouting
Jet grouted columns provide soil stabilization for micro-tunneling operations installing new 60-inch diameter sewer pipe.
Project Overview:
Layne GeoConstruction designed and constructed single-fluid jet grouted columns to depths ranging from 12 to 25 feet within primarily beach sand deposits. Jet grouting provided soil stabilization for micro-tunneling operations utilized to install a new 60-inch-diameter sewer pipe, and underpinning of an existing 24-inch-diameter sewer line and various utilities. Jet grout treatment consisted of constructing parallel rows of columns offset at 3 to 5 feet centers. Columns typically measured 3 feet in diameter.

Although the jet grouting was performed in loose soils at shallow depths, the presence of numerous existing utilities posed a monumental challenge. The location of the new sewer line was directly in-line with, and beneath the existing utility corridor. Three-dimensional CADD models were created and used to determine grout hole surface locations and set­up angles. The modeling proved successful in avoiding utilities and allowed for timely changes in the field for any unforeseen site conditions.

    Value of Work Performed:
$1,300,000
Project Duration:
4 months
Project Completion Date:
March 2001
Project Reference:
Owner:
City of Santa Monica, California
Susan Lowell
(310) 434-2619