Project Overview: |
|
Layne GeoConstruction installed a multiple line grout curtain for the Lyman Run State Park Dam
Replacement Project using the CAGES computer grouting system and six balanced, stable
multi-component grouts.
Work consisted 56,000 feet of drilling and grouting of total of 880 holes. The hole depths were
between 40 ft and 154 ft. A total of 15,200 cubic feet of grout was placed.
Steep slope grouting was conducted on one abutment. Verification holes were cored using a NQ2
wireline coring system. Also, tiedown anchors were installed through the RCC spillway structure
to resist uplift.
|
|
|
Value of Work Performed:
|
|
$2,700,000
|
|
Project Duration:
|
|
6 months
|
|
Project Completion Date:
|
|
September 2005
|
|
Project Reference:
|
General Contractor
Allan A. Myers
Tim Hendricks
(610) 584-6020
Design Engineer
Gannett Fleming, Inc.
|
|
|
|
|
|