Jet Grouting
Jet grouted columns provide soil stabilization for slurry wall construction and excavation support for roof-first tunnel construction.

Project Overview:

  Layne GeoConstruction designed and constructed a system of reinforced jet grouted columns to provide excavation support, and a continuous groundwater cutoff wall between operational AMTRAK and Massachusetts Bay Transportation Authority (MBTA) tracks, at the main rail station servicing Boston and northern New England. The work was successfully completed in miscellaneous fill materials and organic soils without disruption to the active rail station.

Jet grouting was also utilized to stabilize loose and unstable organic and fill soils in the rail yard area, in advance of tunnel slurry wall excavation operations. The slurry wall and roof-first phases of the project were successfully completed on schedule due to the soil stabilization using jet grouting.

    Value of Work Performed:
$3,000,000
Project Duration:
30 months
Project Completion Date:
February 2001
Project Reference:
Owner's Management Consultant:
Bechtel / Parsons Brinckerhoff
Giovanni Aurilio