California Meadows/ SR 29 / SR 37
Sanitary Sewer
Rerouting Project
Vallejo, California |
Back to Project List
|
|
|
|
|
|
|
|
|
 |
|
|
Jet Grouting |
|
Drilling is performed along an embankment for soil stabilization in
preparation for the installation of a new 60-inch diameter sanitary pipe.
|
|
|
Project Overview: |
|
|
Layne GeoConstruction designed and constructed a continuous arrayof jet grouted columns to provide soil stabilization
for micro-tunneling operations installing a new 60-inch diameter sanitary pipe. Work was undertaken along the alignment
of the micro-tunnel construction, on an embankment within a protected and environmentally sensitive bay, and parallel to
a busy state road. Although the contract design specified soil mixing, project test sections included double and
single-fluid jet grouting. Single-fluid jet grouting was chosen to mitigate environmental impacts.
A total of 1,965, 3 feet diameter jet grouted columns were installed. The average drill depth was 17 feet, with a jetting
length of 11 feet, within very soft to soft bay mud and organic peaty soil conditions.
|
|
|
Value of Work Performed: |
|
$1,100,000 |
|
Project Duration: |
|
4 months |
|
Project Completion Date: |
|
February 2002 |
|
Project Reference: |
Project Designer:
URS Corporation
Chris Mueller
|
Owner:
Vallejo Sanitation and Flood Control District
|
General Contractor:
Steve P. Rados, Inc.
|
|
|
|
|
|