California Meadows/ SR 29 / SR 37
Sanitary Sewer
Rerouting Project
Vallejo, California
Back to Project List
 
   
Jet Grouting
Drilling is performed along an embankment for soil stabilization in preparation for the installation of a new 60-inch diameter sanitary pipe.
Project Overview:
  Layne GeoConstruction designed and constructed a continuous arrayof jet grouted columns to provide soil stabilization for micro-tunneling operations installing a new 60-inch diameter sanitary pipe. Work was undertaken along the alignment of the micro-tunnel construction, on an embankment within a protected and environmentally sensitive bay, and parallel to a busy state road. Although the contract design specified soil mixing, project test sections included double and single-fluid jet grouting. Single-fluid jet grouting was chosen to mitigate environmental impacts.

A total of 1,965, 3 feet diameter jet grouted columns were installed. The average drill depth was 17 feet, with a jetting length of 11 feet, within very soft to soft bay mud and organic peaty soil conditions.

    Value of Work Performed:
$1,100,000
Project Duration:
4 months
Project Completion Date:
February 2002
Project Reference:
Project Designer:
URS Corporation
Chris Mueller
Owner:
Vallejo Sanitation and Flood Control District
General Contractor:
Steve P. Rados, Inc.