Sacramento River Crossings
Sacramento, California
Back to Project List
Jet Grouting
Project Overview:
Jet grouting was performed at the entrance and exit locations of three shafts for two new sewer tunnels prior to installation of the 15 feet diameter tunnels. Continuous rows of interconnected, jet grouted columns were installed to improve weak ground conditions at depths of 10 to 40 feet. Over 240 columns were installed for the twin tunnels constructed with a TBM below the Sacramento River.

    Value of Work Performed:
$1,088,000
Project Duration:
3 months
Project Completion Date:
July 2005
Project Reference:
General Contractor:
Sacramento Regional County
Sanitation District
General Contractor:
Parsons Brinckerhoff
Eric Strassevitch
(916) 665-5310