Central Parking Garage Improvements
Massachusetts Port Authority
Logan International Airport
East Boston, Massachusetts
Back to Project List
Drilled Micropiles
A specially fabricated, hydraulic drill rig installs low headroom micropiles within the existing Central Parking Garage structure.
Project Overview:
Layne GeoConstruction, in a joint venture with Nicholson Construction Company, installed 800 drilled micropiles, for new deep foundation support for the addition of two new levels atop the existing five-level Central parking garage at Boston’s Logan International Airport.

The 215 ton capacity drilled micropiles were installed to depths of over 100 feet. Low headroom and limited access, as well as open headroom piles were installed. Two specially designed crawler mounted, hydraulic drill rigs were fabricated for use on the project, to supplement the existing fleet of low headroom drills.

Four drill rigs installed the total of 800 drilled micropiles in six months.

    Value of Work Performed:
$8,100,000
Project Duration:
6 months
Project Completion Date:
January 2005
Project Reference:
Construction Manager:
Turner Construction
Charles Moore