East Shoreline Railroad
Upgrade Branford Station
Branford, Connecticut
Back to Project List
Drilled Micropiles
Low headroom drilling equipment installed drilled micropiles adjacent to active railway operating with live caternary lines.
Project Overview:
Layne GeoConstruction designed and installed 110 drilled micropiles for support of a new railroad station. The drilled micropiles were installed to lengths of 45 to 60 feet, through silty sand and into sand and gravel.

Design loads on the micropiles were 45 and 93 kips in compression and tension, respectively. Work was conducted adjacent to live train tracks with a limited headroom drill rig, to permit adequate separation between the live caternary lines and the drilling equipment.

    Value of Work Performed:
$352,400
Project Duration:
1 month
Project Completion Date:
2004
Project Reference:
General Contractor:
Steve Ryan, Project Manager
(203) 234-2353