Maroon Creek Bridge CODOT
Aspen, Colorado
Back to Project List
Maroon Creek Bridge CODOT, Aspen, Colorado,
Drilled Micropiles
Project Overview:
The new Maroon Creek Bridge on Highway 82 in Aspen, CO required seventy-two 8-inch diameter micropiles to support the two abutments cut into steep slopes. The piles were designed to support 150 kips in compression.

Layne GeoConstruction utilized duplex drilling methods to drill and case through about seventy feet of difficult overburden consisting of cobbles and boulders. Reinforcing steel and pressure grouting provided the main structural elements for the piles. Layne worked through adverse winter weather conditions and navigated restricted access areas to complete the work.

    Value of Work Performed:
$580,000
Project Duration:
6 months
Project Completion Date:
June 2006
Project Reference:
BTE/Atkinson
Ray Schmahl
(970) 945-2431