Red Line Charles Street / MGH Station
Modernization Project
Massachusetts Bay Transportation Authority
Boston, Massachusetts
|
Back to Project List
|
|
|
 |
|
|
Drilled Micropiles |
|
Drilled micropiles are successfully load tested to twice their design capacity.
|
|
|
Project Overview: |
|
Layne GeoConstruction installed 169, 9” diameter drilled micropiles to depths of 80 feet for
foundation support related to the modernization of an existing rapid transit station. Installation
was completed in a heavily congested urban area, adjacent to a major arterial route.
The 50 ton capacity drilled micropiles were successfully load tested to twice their design load.
|
|
|
Value of Work Performed: |
|
$600,000 |
|
Project Duration: |
|
34 Days |
|
Project Completion Date: |
|
October 2004 |
|
Project Reference: |