Wilson Power Plant
Selective Catalytic Reactor Units Project
L G & E Energy Corporation
Centertown, Kentucky
Back to Project List
Drilled Micropiles
Foundation support of 168 drilled micropiles is installed in just under 10 weeks.
Project Overview:
Layne GeoConstruction designed and constructed 168 drilled micropiles to act as foundation support for selective catalytic reactor units. The drilled micropiles were installed with three different drill rigs, each designed to accommodate both low-headroom and unlimited headroom conditions.

The drilled micropiles were drilled to an average depth of 58 feet. The piles were advanced through stiff clays, weathered rock and solid rock. Prior to production, Layne installed and tested a drilled micropile to 200% of the design load, 600 kips in compression and 300 kips in tension.

    Value of Work Performed:
$1,100,000
Project Duration:
3 months
Project Completion Date:
March 2002
Project Reference:
General Contractor:
Duke / Fluor Daniel
100 Fluor Daniel Drive
Greenville, SC 29607
Scott Kane
(864) 281-5374