United States Post Office
United States Postal Service
Myrtle Beach, South Carolina
Back to Project List
Vibratory Ground Improvement
Vibro compaction is performed for foundation preparation for a proposed US Post Office building.
Project Overview:
Underlying loose beach deposits required densification and stabilization for the proposed construction of a US Post Office building. Vibro compaction was the method chosen to improve subsoil conditions to allow conventional spread footing foundation construction.

Vibro compaction points were installed to approximately 25 feet deep, in an equilateral triangular grid pattern. Standard penetration testing was performed to verify performance of the vibro compaction work.

    Value of Work Performed:
$70,000
Project Duration:
10 days
Project Completion Date:
October 1998