Vibro compaction is performed for foundation preparation for a proposed US Post Office building.
|
|
|
Project Overview: |
|
Underlying loose beach deposits required densification and stabilization for the proposed construction
of a US Post Office building. Vibro compaction was the method chosen to improve subsoil conditions to
allow conventional spread footing foundation construction.
Vibro compaction points were installed to approximately 25 feet deep, in an equilateral triangular grid
pattern. Standard penetration testing was performed to verify performance of the vibro compaction work.
|
|
|
Value of Work Performed: |
|
$70,000 |
|
Project Duration: |
|
10 days |
|
Project Completion Date: |
|
October 1998 |
|
Project Reference: |
Owner Engineering Consultant:
S & M E Engineers
Forrest Foshee & Cynthia Hanks
(843) 884-0005
|