Wet Top Feed Stone Column Elements were installed to improve the subsurface soils.
|
|
|
Project Overview: |
|
Site development of the San Juan Creek for the South Coast Water District required the capability
to provide uninterrupted services to the community after a major earthquake. Due to fluctuating
groundwater level at the adjacent San Juan Creek and the high potential for liquefaction of the
saturated loose sand soils, the Engineer determined that stone column densification was necessary
to improve the ground conditions for the project.
Layne GeoConstruction installed over 1,000 Top Feed Stone Column Elements in engineered patterns
over the 80,000 square feet site area to densify the critical areas for site development.
|
|
|
Value of Work Performed: |
|
$402,500 |
|
Project Duration: |
|
3 months |
|
Project Completion Date: |
|
November 2005 |
|
Project Reference: |
Doty Brothers Equipment
Frederic Doucedame