Posey Webster Tunnel
Ground Improvement Demonstration Project
Cities of Alameda and Oakland, California |
Back to Project List
|
|
|
 |
|
|
Vibratory Ground Improvement
|
 |
Jet Grout Columns are installed at the Posey Tube in the Jack London Square site, Oakland.
Vibro stone column installation with fixed lead at Webster Tube section, Mariner Square, Alameda.
|
|
|
Project Overview: |
|
Determination of the most appropriate ground improvement method was necessary for planning one of the
most difficult seismic retrofit projects by the State of California Department of Transportation. Two
submerged vehicular tunnels were constructed during the 1960's, utilizing different construction
techniques and underwater backfill materials.
Layne GeoConstruction was selected to perform two demonstration trials using two distinct ground
improvement techniques- jet grouting and stone columns.
Interconnected jet grout columns, forming a cut-off wall to reduce liquefaction, were constructed beside
the Posey tunnel. Vibro replacement stone column technique was performed at the Alameda Tunnel to densify
loose sand backfill around the tubes..
|
|
|
Value of Work Performed: |
|
$995,000 |
|
Project Duration: |
|
2 months |
|
Project Completion Date: |
|
October 2000 |
|
Project Reference: |
Owner:
CALTRANS
Oungkar Narine
(510) 286-1300
|
|
|
|
|
|